Market:
Manufacturing
Location:
Centurion, Gauteng
Project Objective:
The purpose of this project was to identify the impact on the proposed backup power facility on the flow drivers. This was done by determining the hillslope, soil forms and families, and baseline flow paths towards the downstream wetlands.
Project Execution Strategy:
This assessment was conducted in terms of Best Practice Guidelines, such as the Hydropedological Assessment Guidelines (Van Tol et al., 2023) and the NEMA EIA Regulations (2014).
Project Key Achievements:
Successfully mapped the project area
Identified the corresponding hydropedological soil groups
Identified historic activities that altered the flow paths
Project Tags:
Hydropedology, Soil, Water Use License, Hillslopes